Cost
Conceptual-design, possible study and administrative-fee costs depend on the intervention type and complexity
Check whether the planned intervention needs a location permit, prepare a conceptual design and submit the application electronically through ePermit.
Cost
Conceptual-design, possible study and administrative-fee costs depend on the intervention type and complexity
Usual time
Depends on project completeness, special conditions, environmental procedures and parties’ inspection
Responsible institution
Upravno tijelo
This procedure has one application method.
Submit the application and prescribed electronic attachments through ePermit to the competent authority or Ministry, depending on the type of intervention.
Selected: 0 of 6
Selections are saved only in this browser. We do not store document numbers or personal data.
Check whether you need a location permit
A location permit is issued for statutory, complex or phased interventions, and also for construction when the party requests it. For simpler projects, a building permit without a prior location permit may suffice; check the spatial plan and competent act before design.
Prepare the conceptual design
Engage an authorised architect and, according to the intervention type, authorised engineers. The conceptual design must comply with the spatial plan, special regulations and coordinated disciplines.
Prepare mandatory electronic attachments
Along with the conceptual design, prepare the summary, GML record where needed, environmental decisions and other attachments that depend on the intervention type. Do not attach proof of legal interest unless the Act expressly requires it for that type.
Submit the application through ePermit
In ePermit, select the location-permit application, upload the prescribed attachments and submit it electronically to the competent authority.
Open official e-serviceOpens in a new tab.Follow special conditions and parties’ file inspection
The competent authority obtains special conditions and connection conditions through ePermit where prescribed. Before issue, parties must be allowed to inspect the file and make submissions.
Plan the next permit in time
For most interventions, a location permit expires if, within four years of becoming final, no building-permit application is submitted for at least one phase or stage, or the intervention requiring no construction act is not started. For a permit issued by the Ministry, the period is six years.
| Procedure | Price | Deadline |
|---|---|---|
Procedure cost The final amount depends on the applicable tariff and circumstances of the individual application. | Conceptual-design, possible study and administrative-fee costs depend on the intervention type and complexity | Depends on project completeness, special conditions, environmental procedures and parties’ inspection |
Information was editorially reviewed on 25/10/2026. Before applying, check the latest information on official websites.
Report incorrect or outdated information. Your report is a signal for editorial review and does not change the guide automatically.
Report incorrect or outdated information